Progress Week 3
From the last project progress check I had done the I had the walls for 2.5 out of the 5 I had to do and had the fence. For this time I have the all the walls not including the windows, the deck where impa's house will reside in, the door /arch of impa's house, one of the wire poles and the entry arch where one would enter to get into impa's house. there are other things i want to refurbish so some things may be different in the future.
For the arch and the door way I had to make them the same spaced out in between since in came they seem to be similar in width. these where the 2 tricky ones I had to do since they had a bit more of organic flow to them and to have the same shape as the one in game. I wont go into to much detail since I think I can do those details in texturing.
Now for the deck, I had to do a bit of math on this one and as I said in a pervious progress check I can't do the deck without finding all the dimensions for the walls. Now since I have the walls for the house I can find out how big the deck should be. Here is a how i came up with it. i gave it with a five spacing around it.
Comments
Post a Comment