Week3 Progress BOTW Scene

 Progress Week 3

    From the last project progress check I had done the I had the walls for 2.5 out of the 5 I had to do and had the fence. For this time I have the all the walls not including the windows, the deck where impa's house will reside in, the door /arch of impa's house, one of the wire poles and the entry arch where one would enter to get into impa's house. there are other things i want to refurbish so some things may be different in the future.



    For the arch and the door way I had to make them the same spaced out in between since in came they seem to be similar in width. these where the 2 tricky ones I had to do since they had a bit more of organic flow to them and to have the same shape as the one in game. I wont go into to much detail since I think I can do those details in texturing.

    Now for the deck, I had to do a bit of math on this one and as I said in a pervious progress check I can't do the deck without finding all the dimensions for the walls. Now since I have the walls for the house I can find out how big the deck should be. Here is a how i came up with it. i gave it with a five spacing around it.


    Now to be honest I have worked on this project during the thanks giving break minimally. Usually a 1 hour to 1.5 hours a day which is not much to me, and also I did not work on anything on Thursday or Friday. at this point i am a little behind and also you may notice there are no UV's present in this. what I want done is the last part which is the roof and the side walls that lead up to the roof don then I can start uving. Since each member only can make 2 one by one uvs. I need to finish modeling then I can uv and see how I will organize all UVs with the completed components. From this point this might be my priority mostly unless i have a difficult 180 assignment the i need to balance. The other hard part of this house will be the roof and the side walls so I will see if I can have some assistance with that in class or during office hours.


Comments